Our 2 unlicenced Solar Power Plants, Karçel GES ve Egekar Ges, which are under the same roof in Denizli city, Turkiye, are supplying energy within 7000m2 area with 5.320 solar panels with power 1379,4 kwe.
Power | Number Of Solar Panels |
---|---|
684,84 KWe | 2,660 |
Power | Number Of Solar Panels |
---|---|
694,2 KWe | 2,660 |
BOZYAKA RES, which belongs to Kardemir Celik Sanayi A.S. located in Aliaga/Izmir, started energy supply in 2012. KARDEMIR utilises this energy for some part of its ‘steel merchant bars and profiles’ production process.
OVA RES, which belongs to Ayres Elektrik Üretim A.Ş under Kardemir structure started energy production in September, 2016, in Aydin city, in Turkiye
Our SARAL-3 Hydroelectric Power Plant, which we established in the Çatak district of Van, was commissioned on 18.04.2020 and produces electricity with a mechanical installed power of 5.4 MWm and an electrical power of 4.99 MWe. Our power plant is operated by KRD Van Elektrik Üretim A.Ş which is one our group companies.
Our Aslandağı Beyyurdu Hydroelectric Power Plant, which we established in Şemdinli District of Hakkari province, was commissioned on 20.06.2021 and produces electricity with a total capacity of 19.76 MWm installed power, the first part of which is 9.42 MWe electrical power. Our power plant is operated by Aslanlı Van Elektrik Üretim A.Ş which is one of our Group companies.